TERM SUMMARY

TACE is the NATO-standardized abbreviation for "type A cost estimate" (French: estimation de coût de type A, or ECTA).

Why it matters
TACE stands for type "A" cost estimate . It is an abbreviation registered in the NATO Glossary of Abbreviations Used in NATO Documents and Publications, issued as Allied Administrative Publication AAP-15(2013).
Category
Canadian government procurement terminology
Reference role
This term page is designed to be linkable, crawlable, and easy to quote or summarize.

TACE stands for type "A" cost estimate. It is an abbreviation registered in the NATO Glossary of Abbreviations Used in NATO Documents and Publications, issued as Allied Administrative Publication AAP-15(2013). The glossary gives the English expansion "type A cost estimate" and the French equivalent "estimation de coût de type A", abbreviated ECTA.

In NATO records, a type A cost estimate is a reference cost figure for a project. It is the number against which proposed prices are compared when member nations decide whether to authorize spending. The term belongs to NATO terminology and does not appear in Canadian federal procurement guidance, which uses its own estimate classes. Canadian suppliers working on NATO-linked or multinational defence projects are the ones most likely to see it. The official glossary is available through the NATO Archives.

What AAP-15 says about TACE

AAP-15 is a bilingual administrative publication. Its job is consistent wording across NATO documents, not technical doctrine. Each entry gives the abbreviation, the full English term, the French equivalent and the NATO body responsible for the term. The TACE entry is attributed to the NATO Abbreviation Staff Group.

The glossary confirms that TACE is a formally registered abbreviation and fixes its meaning. It does not explain what separates a type A estimate from other estimate types. NATO's public documents use the type labels without publishing the criteria behind them, so the label is best read as a category name within NATO costing.

How type A estimates appear in NATO infrastructure records

The clearest public example comes from an archived record of the North Atlantic Council's Infrastructure Committee. In a discussion about opening the price envelope for a NATO communications procurement, the United Kingdom delegation reserved its position on authorization if the final price exceeded the "Type A cost estimate of IAU 10.7 million plus an allowance for inflation". IAU means Infrastructure Accounting Unit, the unit used for NATO common-funded infrastructure.

This shows how the estimate works in practice. It is a baseline, expressed in IAU, with an allowance for inflation. Prices above it can trigger a fresh authorization decision.

Other committee papers use parallel labels. A NATO Infrastructure Committee working paper refers to "Type PC" and "Type CM" estimates for accelerated projects. NATO infrastructure costing therefore uses several type categories, and type A is one of them. The wider programme is described in Aspects of NATO Infrastructure and Logistics, which covers how costs for airfields, communications networks and other facilities are shared across the Alliance.

Other meanings of TACE

TACE is a multi-use acronym. A United States Defense Intelligence Agency acronym list gives it as "Technical Analysis Cost Estimate" and "Tactical Air Coordination Element". In medicine it commonly means transarterial chemoembolization. Only the NATO glossary ties it to "type A cost estimate". Check the source document before assuming which meaning applies.

TACE and Canadian Class A estimates are different things

Canadian federal real property work uses its own letter-coded classes. The PSPC documentation manual for real property projects defines Class C (conceptual), Class B (substantive) and Class A (pre-bid) estimates, prepared in elemental format under UniFormat. A Class B estimate must be accurate enough that no more than a 10% design allowance is required. A Class A estimate is the final estimate prepared before tender, based on completed contract documents.

The Doing Business with PWGSC manual sets the same structure and puts the Class C design allowance at 15%. Neither manual uses the abbreviation TACE or the phrase "type A cost estimate".

The two uses of "A" are separate. The Canadian Class A estimate is a pre-bid construction estimate. The NATO type A estimate is an authorization baseline in IAU. No public source equates the two.

What TACE means for a supplier bidding on Canadian contracts

You will not meet TACE in routine federal tenders on CanadaBuys, where cost estimate language follows the PSPC Class A, B and C structure. If you pursue NATO common-funded infrastructure work or multinational defence projects, expect type A estimates to set the price envelope that your bid is judged against. A price well above the estimate can send a project back for further authorization, so bid pricing should be built with that ceiling in mind.

Do not treat a Canadian Class A estimate as a stand-in for a NATO type A estimate. When TACE appears in a document, confirm that it comes from a NATO source and read the project's own cost schedule for the figures that apply.

Find government contracts that match your business

hundreds of portals monitored. AI-powered qualification. Daily briefings delivered to your inbox.

Use your work email, or book a 15-min call.

We use cookies to improve your experience. By continuing to use this site, you consent to our use of cookies in accordance with our Privacy Policy.