Reading the City's files…

Toronto, checked All questions
Open Data Demo Night · 25 Nov 2026

Toronto publishes {datasets} files about itself. What do they say about your street?

See every building permit applied for there since 2023, and how long each took, from the City's own file.

Or guess first

Since {launchDate}, Toronto lets people run their drawings past an AI pre-check before they apply for a building permit. Did permits get faster? Before the pre-check, out of every 100 applications for work on houses, how many had their permit within 30 days?

50 in 100
Akash Shetty
Co-founder and CTO

More questions, answered from the City's own files

Pick one. The main numbers open their working, and every answer says what the data cannot show.

{filesUsed} of {datasets}City open data files read by this page
{permitRows}permit records and {awards} contract awards counted
Free to reusefrom the City of Toronto's Open Data program, so anyone can check this page or build their own
This page is for

ComputedPermit and contract numbers are computed from {permitRows} permit records and {awards} contract awards when the page is built.
CheckedRebuilds an earlier analysis of the same files exactly; 10 of 10 sampled records (5 permits, 5 contracts) match the City's portal.
Limits shownEach answer says, in place, what the data cannot show.

Did the wait get shorter?

A street of houses, anywhere in Toronto

Say you want a deck built before summer. You send in your drawings, and you wait for the City to send back a permit.

The day you applied and the day the permit was issued are both in the City's open file. So anyone can count how long people waited, before the AI pre-check and after it.

A deck. A garage. A basement suite. Each needs a building permit, and "issued" means the City has said yes and sent it.

{afterN} applications came in during the first {weeks} weeks after the launch. Each has now had its 30 days.

issued within 30 days, {afterFrom} to {afterTo} 2026 ({afterK} of {afterN})
the same weeks in 2025 ({prevK} of {prevN})

The {weeks} weeks just before the launch: . Set against last year, no change shows so far.

This cannot show whether the pre-check works. The City's file does not mark which applications used it, and the City has not said how many did. If few people use it, nothing would show here. {weeksCap} weeks is also short.

The file cannot tell a slow review from a slow reply by the applicant. Applications withdrawn or refused before issue may be missing from it, in every year alike.

Your ward

The whole city, 25 wards

The same city, the same rules, a different part of town.

Each ward is raised by how many of its applications for work on houses had a permit within 30 days: taller and brighter means a higher share. Somewhere in there is yours.

Across the city the share barely moves. Between wards it moves a lot: across the 25 wards, from to , in the year before the launch. Wards differ in what people apply to build, so they stand side by side here, not in a ranking.

Tap your ward on the map for its report.

All 25 wards as a list

Not a ranking of anyone's work. Wards differ in what people apply to build, and some had few applications.

Ward of the permit's address, from the City's own ward code. Boundaries: City Wards, 25-ward model. {wardFrom} to {wardTo}.

How long will mine take?

Your own project

You are not the first to ask. People applied for the same kinds of work all through the year before the launch: decks, garages, additions, second suites.

The City's file shows what happened to them.

Pick what you want to build. Here is what happened to everyone who applied for the same thing in the year before the launch.

History, not a promise. A complete application moves faster; one the examiner sends back moves slower. "No permit" includes applications cancelled or refused, which the file does not explain.

Small residential first applications, applied {estFrom} to {estTo}, by the City's "work" field. Ward choices with fewer than 10 applications fall back to all of Toronto.

Your street

A street you know

Every permit has an address. If someone on your street asked the City for permission to build, it is in the file.

It shows what they asked for, when, and how long the answer took.

The charts so far count permits. Here are the permits themselves: type a street you know and see each permit applied for there since 2023, and how many days it took to issue.

On the city: each address with a permit is a pin of light. Blue, issued; amber, not issued yet. A taller pin took longer.

A permit is not the whole story of a building. The file cannot say why one took long, and it leaves out work done with no permit.

All permit types, one line per permit first applied for since 2023 (a number the City reused for another permit type counts as its own permit). "Days" is application date to issue date. Not shown: planning applications, requests for exceptions to the zoning rules (Committee of Adjustment files), or work done without a permit.

You are the plans examiner

A plans examiner's desk

This application is made up. It was written for this test, with 11 faults planted in it.

In it, a homeowner wants to add a room at the back of the house. Their note says the contractor is booked to start in three weeks.

The file lands on your desk. Someone has to check it against the rules before anything is built, and today that is you.

The application adds a rear extension to a house. Its zoning table says the rear yard is 7.5 m, exactly the minimum. Is it?

The lot is 30.48 m deep. Front yard 6.40 m, the house 11.90 m, the addition 6.10 m. What is left at the back?

A made-up application, three runs per model, and the marking was done by an AI that also scored highest. Nobody who examines plans has re-marked it yet. Not a measure of the City's tool.

What would the pre-check need to catch?

Between the applicant and the examiner

When a plans examiner sends back corrections, the applicant goes another round: fix the drawings, send them in, wait again.

The City's AI pre-check is meant to catch problems before you apply. How much time that saves depends on how many of an examiner's corrections it catches. The City has not published that number.

Set how many of an examiner's corrections the pre-check catches, and see what follows.

67% of corrections caught
–rounds of review per application (3.4 without the pre-check)
–weeks saved per application
–corrections still to fix (23.5 without the pre-check)

For scale: the City's budget carries for AI-assisted plan assessment in 2026 and 2027.

Starting values are Honolulu's, reported by Clariti, the maker of the pre-check Toronto uses: 3.4 rounds of review and 23.5 corrections per application without the pre-check, 67% fewer corrections with it. They rest on 19 permits that used the pre-check and 17 that did not; the report does not say how they were chosen. Seattle, which tested the same tool, describes each round as "a month or more"; 4 weeks is used. Seattle also found that how many of a reviewer's corrections the pre-check can catch matters as much as how accurate it is. The two rules give very different answers; the truth is probably between them. False alarms, which cost applicants time, are left out.

Sources: Honolulu, Seattle, City of Toronto 2026 Technology Services budget notes.

Do I need a permit?

Before you buy the lumber

Say you want a fence, a shed, or a new window. The first question is whether the City needs to see it before you start.

The City answers that on one long web page. Here it is, one project at a time, in the City's own words.

Pick your project. What you see is the City's own answer, in the City's own words, found on its page When Do I Need a Building Permit?

Even with no permit, zoning rules still apply, as the City's page itself says. For your own project, ask Toronto Building.

What Toronto is building

One line per application

Say you wonder what people across the city are building. Each application carries a short description of the work: a few words about a deck, a second suite, a new entrance.

One at a time they say little. Read together, they show what people across the city are building.

Loading…

Who the City buys from

The City's receipts

Say you want to know where the money goes. The City publishes a file of contracts it has awarded: who won, how much, and for what.

Adding those lines up takes some care.

Loading the City's contract awards…

Checking records like these is my day job. I am co-founder and CTO of Publicus, which reads public records from hundreds of government websites across Canada and helps governments spot contracts at risk, find savings and know who they buy from. Publicus sells to governments. This page is part of Public Intelligence, by Publicus. It uses only the City's public files and no Publicus data.

City of Toronto Open Data, Toronto Bids Awarded Contracts and Non-Competitive Contracts. One line per award; cancelled awards left out. Supplier names as the City typed them. Award values, not what was spent; amendments after award are not included. Others have built on these files before this page: the Toronto Bids Archive at Civic Tech Toronto keeps the City's bid documents, and Richardson Dackam's supplier list joins the many spellings of each supplier's name.

The share awarded without competition is at least this much. The City says its file of contracts awarded without competition keeps a contract for 18 months, and the file lists far fewer awards than the City's own report counts. For 2025 that report shows 498 purchases without competition worth $287.0 million, 8.8% of about $3.3 billion bought. Source: City of Toronto, Supporting Narrative for 2025 Procurement Metrics.

The City's number, and the auditor's

Toronto City Hall

You ask a plain question: are building permits handled on time?

The City's own report says 87 in 100 were. The Auditor General sampled the files and found more than half were not. Both are describing the same office.

Three counts of the same office. All three can be true at once, because each counts something different.

87%of complete permit applications reviewed within the time the law allows in 2024, as the City reports it. Its target is 95%. The same table, in the 2026 Budget Notes, projected 94% for 2025.
55%of the applications the Auditor General sampled were not processed within the time the law or the City's own rules allow (report of February 2024).
of applications for work on houses had a permit within 30 days, applications received {wardFrom} to {wardTo}, counted on this page from the open file.

The auditor also found that late reviews ran about 17 business days over on average, and that 44% of open applications in plan review had seen no activity for more than six months.

The City's figure counts review time on applications it judged complete. The auditor checked a sample, from an earlier period. This page counts every first application from the day it was made to the day the permit was issued, including time waiting on the applicant. None of the three says which is the right measure.

Sources: City of Toronto 2026 Budget Notes, Toronto Building ("% complete permit applications reviewed within legislated time", 2024 actual); Auditor General, Audit of Intake and Plan Review of Applications for Building Permits, February 2024.

How much is built with no permit?

Across the city

Often it goes like this. Someone builds without asking. A neighbour notices and calls the City. An inspector comes out and, finding no permit, writes an order.

The City publishes those orders in an open file.

Planning work, or unsure about something already built? Check whether it needs a permit, or go to the City: building permits.

{npPct} in 100 orders in the City's building violations file are for work done with no permit: {npN} of {npTotal} orders since {npFrom}. {npOpen} of them are still open.

Where

An order is what an inspector found, often after a complaint. It is not a count of all work done without a permit, and wards differ in size and in how old their houses are. {npYear} is a part year, to {npAsof}.

City of Toronto Open Data, Building Construction/Demolition Violations. Orders whose "work" field reads "Order Issued No Permit"; one line per order; year is the year the order's file was opened; ward from the City's own ward code.

The wait before the wait

Before the permit

Before the permit, there is often another wait. Many projects first get a zoning certificate: the City checks the plans against the zoning rules.

The 30-day clock on this page starts only after that. So how long does this first step take?

Many projects get a zoning certificate before they apply for a building permit: a first review of the plans against the zoning rules. The permit clock on this page starts only after that.

{zPct} in 100 certificates applied for from January to August {zYear} were issued within 60 days ({zK} of {zN}). The same months of {zPrevYear}: {zPrevPct} in 100.

The file does not say why a certificate took long: waiting on the applicant looks the same as waiting on the City. Applications later cancelled count as not issued. Not every project needs a certificate.

City of Toronto Open Data, Preliminary Zoning Reviews, to {zAsof}. Zoning Applicable Law Certificates (file numbers ending ZAP), first applications only, application date to issue date. January to August only, so every application has had at least 60 days.

Need an exception first?

Before the permit, again

Say the room you want sits a little closer to the lot line than the zoning rules allow. Before any permit, you ask for an exception, called a minor variance.

A panel of residents appointed by council, the Committee of Adjustment, hears it. The day you applied and the day of the hearing are both in the City's open file.

{vaPct} in 100 minor variance applications made from January to July {vaYear} had a hearing date within 90 days ({vaK} of {vaN}). The same months of {vaPrevYear}: {vaPrevPct} in 100 ({vaPrevK} of {vaPrevN}). In {vaOldYear}, four years earlier: {vaOldPct} in 100. In {vaFirstYear}, the first year charted: {vaFirstPct} in 100.

Of those with a hearing date, half had it within {vaMed} days. In {vaOldYear} it was {vaOldMed} days.

The file does not say why this got quicker, and this page claims no cause. A hearing is not an answer: the dates do not say when the applicant had a decision. An application that was deferred and heard again shows one hearing date. The {vaNoDate} applications from {vaYear} with no hearing date in the file (withdrawn, cancelled or not yet scheduled) count as not heard within 90 days.

City of Toronto Open Data, Committee of Adjustment Applications, to {vaAsof}. Minor variance applications, closed and active files together, every application counted once, date received to hearing date. January to July only, so every application has had at least 90 days.

The City's own scorecard

Toronto City Hall

The City keeps a public dashboard of its own key indicators: jobs, libraries, shelters, building, revenue. For most of them it also says which way is good, up or down.

So take the City at its word. Set each indicator's latest figure against the same period a year earlier, and count.

{scN} indicators, each one's latest figure against the same period a year earlier, sorted by the City's own label for which direction is good.

{scBetter}moved the way the City wants
{scWorse}moved the other way
{scRest}not scored

"The way the City wants" is the City's own label, not a judgement made here, and it compares one period with the same period a year earlier: a single month can swing. Many of these are outside the City's control, such as home prices, jobs and bankruptcies. Nothing here says how well any division does its work. Not scored: {scErr} indicators that carry the identical figure for {scTwinWhen} ({scTwin}), which looks like an entry error in the file, and {scNone} with no direction set. {scTransit} transit indicators are left out.

City of Toronto Open Data, Toronto's Dashboard Key Indicators, read {scAsof}. Each row shows its own period; a few indicators were last updated in 2024 or 2025.

How full are the shelters?

One night in the shelter system

Each night the City counts who slept in its shelters, respite sites and hotel programs, and how many beds and rooms were left.

It publishes the count the next day. Here is the latest night in the file.

{shPeople} people were in the City's shelter system on the night of {shDate}, across {shPrograms} programs.

{shBedsOcc} of {shBedsCap} beds were taken, and {shRoomsOcc} of {shRoomsCap} rooms. {shFull} of the {shPrograms} programs had no bed or room free.

Need a place to stay tonight, or know someone who does? The City's homeless help page says to call 311 for emergency shelter or street outreach, and lists the City's other services.

The file counts people inside the system. It does not count people sleeping outside or people turned away, so a falling count does not show that fewer people need shelter. The count was {shFirst} on {shFromDate}; the file does not say why it fell. Beds and rooms open and close through the year, and a room can hold a whole family. No shelter is named here.

City of Toronto Open Data, Daily Shelter & Overnight Service Occupancy & Capacity, to {shDate}. People, beds and rooms added up across every program listed for that night.

What AI does the City say it uses?

Toronto City Hall

The City keeps a public list of the AI it uses, and the pre-check is on it.

The entry holds one detail that matters here: applicants hand in the pre-check's report with their application, and the City keeps it.

The list is called the AI Register. It names three tools: the Toronto AI Assistant, the Building Permit Application Pre-Check, and Microsoft Copilot.

The pre-check's entry says it is CivCheck, made by Clariti Software, and that its results are "advisory only": City staff independently review every application. It also says applicants must submit the pre-check's report with their application, and that the City keeps the report as part of the permit record.

So the City can tell which applications used the pre-check. The open permit file cannot: it has no field for it. That one field would let anyone compare the applications that used the pre-check with those that did not.

The entry says the City tracks how the pre-check is used and how well it performs. It publishes no figure for either. The open data catalogue has no dataset about the City's AI tools.

Sources: City of Toronto, AI Register and its Building Permit Application Pre-Check entry (dated 21 October 2026), read 24 November 2026.

Waiting for a home

A place on a list

A household applies for a home it can afford and is given a place on a list. Then it waits.

Every three months the City publishes how many households are on that list, how many were housed, and how many joined.

{wlN} households were on the City's waiting list for subsidised housing in {wlQ} (rent-geared-to-income housing, where rent is set by what a household earns). That quarter, {wlHoused} were housed, and {wlNew} joined or rejoined the list: about {wlRatio} for each one housed.

Want to apply, or keep your place on the list? The City's rent-geared-to-income page says how, and who can apply.

Early in the file, the list dropped from {wlFirstN} to {wlSecondN} in one quarter ({wlFirstQ} to {wlSecondQ}), which the file does not explain; in {wlQ} it was {wlN}. A household can wait for years, so "housed this quarter" and "joined this quarter" are mostly different households.

City of Toronto Open Data, Centralized Waiting List Activity for Social Housing, quarterly, {wlFirstQ} to {wlQ}.

Ask the files

Your turn

The files are as open to you as they were to me.

Ask what you would ask the City, in your own words.

Ask about permit times in a ward, a kind of work, a street, City contract awards and supplier names, building orders for work without a permit, minor variances, zoning certificates, development applications, 311 requests, shelters or the housing wait list. AI works out which count answers your question; the answer itself is counted from the City's files, so every figure can be checked.

Or try one:

Three questions this page raises and the City's files cannot answer yet.

    Six fixes for the City's contracts file

    Open data gets better when people use it and report back. Adding up the City's contract awards turned up six small things that would make the file easier for everyone to use. Here they are, each with a fix and the lines ready to download, for the City's Open Data team.

    1. {repeats} lines repeat another line. Same award, supplier, amount to the dollar and date. Fix: publish each award once, or number the lines so a real second award can be told from a copy. Download the repeated lines (each one listed once, with its number of extra copies)
    2. Three awards are above $1 billion and are worth a second look. $9.05 billion dated 17 May 2017 (document 3901175008), $4.16 billion dated 17 Sep 2018 (2282018000) and $1.90 billion dated 23 May 2018 (9117177338). Read as ten digits, the first two amounts begin 905 and 416, the phone codes of the Toronto area: they look like phone numbers typed into the amount field. Fix: check these against the award records, and flag an amount for a second look when it reads as a phone number or is very large. Download the three
    3. {unreadable} award lines hold an amount that is not one number. Some hold several amounts typed together, or a price per unit, and some of these lines repeat. Also in the file: awards in US dollars ({foreign}), and {zero} awards where the amount is zero, less than 50 cents, or blank. Fix: one number in the amount field, the currency in a field of its own, and a clear mark for "not known yet". Download these amounts Download the zero and blank ones
    4. The award value moved to a different field. Newer records leave Award_Amount empty and carry the value in Initial_Contract_Val. Anyone adding up only the first field misses most of the awards dated 2026. Fix: say so in the file's description, with the date of the change. Download the count by year
    5. One category is spelled two ways. In the column High Level Category, 2,696 awards read "Goods and Services" and 2 read "Goods & Services". Anyone grouping by category gets two groups for one thing. Fix: one spelling, chosen from a fixed list when the award is entered.
    6. One company, written several ways. The file has 5,686 supplier names; joined by one simple rule (capitals, punctuation and spaces set aside, "&" read as "and", a leading "The" and endings such as Inc. or Ltd. dropped) they come to 3,800 suppliers, and 1,100 of them appear under more than one spelling. Anyone adding up by name splits these suppliers into pieces. Fix: a supplier number on each award, from the City's own list of suppliers. Download one clean list See the names written the most ways

    Also noticed, in this file and the others

    • Three non-competitive awards are dated in December 2026, after the day the file was read (24 Nov): documents CW2315393 (2 Dec), CW2313485 and CW2313494 (18 Dec). The date may be when the contract starts rather than when it was awarded. Fix: say in the file's description which date the column holds.
    • Some records carry no ward. 266 building orders (dated 1998 to 2015), 61 minor variance applications (2019 to 2026), 12 development applications (filed 2009 to 2023) and 20 requests to 311 (2025 and 2026). They are counted in Toronto's totals and in no ward. Fix: where a record has an address, its ward can be filled from the City's Address Points file.

    Thank you to the City's Open Data team, who publish all of this and keep making it better.

    One sheet, with the address of this page.

    This page counts each repeated line once, leaves out the awards above $1 billion and the amounts it cannot read, and says so beside the totals.

    City of Toronto Open Data, Toronto Bids Awarded Contracts and Non-Competitive Contracts, read {contractsRead}. The counts are computed when the page is built. The downloads are spreadsheets (CSV) with the City's own record numbers, dates and divisions; the supplier list holds supplier names as the City published them, and the others leave out every name; all of them leave out every address, email and phone number in the City's files, and were made from a second read of the same files on 25 Nov 2026, which held one more award than the read above.

    The file alone cannot show whether a repeated line is a copy or a real second award, or whether a large amount is wrong. Only the City's own records can settle that. None of this is about the contracts themselves or the people who entered them.

    How this was checked

    Every figure on this page was checked one by one on 25 November 2026: counted again from the City's files, or found in the source named beside it. This is that record.

    The method

    • Counted, not typed. Each number is counted from the City's own files when the page is built. Where a number comes from a report, the report is named beside it.
    • Checked again. Each figure was recounted from the data files, rebuilt from the raw City file, or found in its source. "Not confirmed" means it could not be checked that day, most often because the raw file was not kept.
    • Sampled by hand. Records picked as a sample were compared with the City's portal, and a sample of the AI's labels was read by a person.
    • Limits beside the answer. Each answer says what the data cannot show.

    Every figure

    Loading the record…

    What was fixed

      The files to download

      The lines behind the six fixes for the City's contracts file, as CSV:

        The record covers the figures as they stood on 25 November 2026. Since then, wording marked "fixed" was corrected on the page.

        How this was built, and checked

        The numbers about Toronto on this page come from files the City publishes, or from a public report named beside them. This is what stands behind them.

        {filesUsed} filesfrom the City's open data, among them {permitRows} permit records and {awards} contract awards, read in full
        Counted, not typedthe permit and contract numbers are counted from those files each time the page is built, and the main permit numbers open their working when you click them
        10 of 10records picked as a sample matched the City's portal (5 permits, 5 contracts)
        Checked by handwhere an AI model reads permit descriptions, a sample of its labels was checked by a person
        6 fixesfor the City's contracts file, found along the way and handed back with the lines to check. See them
        Limits in placeeach answer says, right beside it, what the data cannot show

        Built over three days, 23 to 25 November 2026, by one person directing an AI coding agent. Most of that time went into more of the City's files, plainer words and the checks above.

        Every figure, as it was checked: the method, the full record, what was fixed and the files to download.

        The start (10:52 pm, Mon 23 Nov) is from the file system; the first public link (11:31 pm) is from the working session's own record. An earlier analysis of the same permit files (53% of 1,139 applications within 30 days) was also rebuilt and gave the same figure.